Technical information Crab range

FALSEWORK - TECHNICAL INFORMATION- 2023 300 ASSEMBLY INSTRUCTIONS CRABÉTAI 2.50 m × 2.50 m FALSEWORK TOWER 1 •Place and lay the adjustable baseplates on the distribution wedges. •Interlock the bases and fit the ledgers. •Level. •Fit the SAD safety guardrails and lock them using MULTICRAB ledgers (see detailed instructions on fitting SAD safety guardrails). MULTICRAB reinforced or normal ledgers according to the loads to be taken up. 3 •Lay the first deck. •Fit the 3.00 m uprights. 2 Dismantle in the reverse order of assembly. DISMANTLING 4 •Fit the MULTICRAB diagonal braces. •Fit and adjust the slides. •Assemble the adjustable diagonal braces and ledgers. •Fit and adjust the fork heads. •Inspect the tower and draft the acceptance report. 6 •From the bottom, lay the deck over the entire grid section. •For a taller tower: Continue assembling, following steps 2 to 5 (with 2.00 m uprights). 5 Remember the 3rd guardrail rail perpendicular to the ladder, Check stability according to the height/width ratio of the tower. See the assembly recommendations presented at the beginning of this technical information.

RkJQdWJsaXNoZXIy OTQ2MzM=