FALSEWORK - TECHNICAL INFORMATION- 2023 284 ASSEMBLY INSTRUCTIONS TOWER WITH 6 LEGS REQUIREMENTS •Ensure that the load is evenly distributed on the ground. •Ensure that the base is levelled. •Fit the first level frames from inside the tower. •Ensure that the towers are stable. •Centre the load in the fork heads. •Place and lay adjustable baseplates on distribution wedges if necessary. •Interlock the bases and ledger. •Fit the horizontal diagonal brace and level it. 1 2 •From the inside of the tower, fit the first frame in the shaft of the diagonal brace and turn to lock it. •Lay 4 x 0.30 m PANACIERs in a temporary position while moving backwards in the tower. 4 The central side must be wind-braced with diagonal braces and ledgers on all levels. •Fit four 1.50 m x 0.30 m PANACIERs. •Assemble the second level of triangles in the opposite direction. 3 5 •Mandatory wind bracing of the central side with one ledger and one diagonal brace. •Fit horizontal diagonal braces crosswise in relation to the first one if necessary. •Assemble the 3rd level of triangles as in step 2. 7 •Fit 2 more 0.30 m PANACIERs in a temporary position. •Access the upper level then lay the PANATRAP in a temporary position. 6 Assembly of towers with 6 legs Frame Single standard Ledger Diagonal brace
RkJQdWJsaXNoZXIy OTQ2MzM=