257 FALSEWORK - TECHNICAL INFORMATION - 2023 FALSEWORK 1.00 m × 1.00 m FALSEWORK TOWER REQUIREMENTS •Ensure that the load is evenly distributed on the ground. •Ensure that the base is levelled. •Fit the first level frames from inside the tower. •Fit the trapdoor next to the ladder. •Ensure that the towers are stable. •Centre the load in the fork heads. 1 •Lay 3 x 0.30 m Panaciers. •Add frames on the second level. •Install the base and level it. •Lay the frames on the first level with the access frame. •Lay a 0.30 m Panacier •The upper level can be accessed using the built-in ladder. •Add 2 x 0.30 m Panaciers. Access 2 3 4 •Remove 2 x 0.30 m Panaciers. •Lower the lower level to remove the third PANACIER. •Fit the frames on the third level. •Fit a 0.20 m Panacier and a deck with trapdoor. 5 6 •The first-level deck can be removed. •Access the upper level and fit and adjust the adjustable fork heads. 7 Assemble a temporary deck level. Assemble a temporary deck level. See the assembly recommendations presented at the beginning of this technical information.

RkJQdWJsaXNoZXIy OTQ2MzM=