Technical information Crab range

FALSEWORK - TECHNICAL INFORMATION- 2023 256 ASSEMBLY INSTRUCTIONS TOURÉCHAF 1.50 m × 1.00 m FALSEWORK TOWER REQUIREMENTS •Ensure that the load is evenly distributed on the ground. •Ensure that the base is levelled. •Fit the first level frames from inside the tower. •Fit the trapdoor next to the ladder. •Ensure that the towers are stable. •Centre the load in the fork heads. 1 •From the inside of the tower, fit the first frame in the shaft of the diagonal brace and turn to lock it. •Install the base and level it. •Fit the 1.50 m access frame for easy access. Access 2 3 4 •Lay the first 1.00 m deck with trapdoor. •Fit two 1 m decks with trapdoor and add the second level. •Move up to the next level and fit the second deck with trapdoor 1.00 m. 5 6 •Assemble the third level. 7 8 •Move the second deck with trapdoor from the lower level. •Move the first deck with trapdoor 1.00m. •Remove the first deck level. •The upper level can be accessed using the built-in ladder. 9 10 •Fit and adjust the fork heads. 11 Assemble a temporary deck level. Raise the decks with trapdoors to their final position so that there is a height of 2.00 m between decks. Dismantle in the reverse order of assembly. DISMANTLING

RkJQdWJsaXNoZXIy OTQ2MzM=