Technical information Crab range

111 MULTICRAB - TECHNICAL INFORMATION - 2023 MULTICRAB ASSEMBLY SLIDING PLATFORM WITH MATERIALS The lifting tower is often, on a scaffolding, a zone at risk for the operators with in addition very often difficulties in handling loads. Entrepose Échafaudages suggests that you create your own sliding platform for materials in your lifting tower by adding accessories to your MULTICRAB range with only 4 parts. This system allows you to handle loads up to 1 Tonne easily distributed and in complete safety for employees. Contrary to conventional platforms, our sliding platform allows you to store on one or two levels your load while still freeing up the lifting tower. Load-bearing capacity: 1 T distributed •Quick assembly, CRAB technology •100% safe use (prevents dangerous manipulations) •Easy to use •Economical (no need for a lift) •Frees up the lifting tower despite the presence of a load on one or two levels • Less risk of MSDs ADVANTAGES 4 m RAIL Part number Description Weight in kg 100007- 4 4 m rail 23.00 LOAD-BEARING BOARD BEARER Part number Description Weight in kg 100002- 5 Load-bearing board bearer 13.53 2 m LEDGER SUPPORT Part number Description Weight in kg 100008- 2 2 m ledger support 9.60 GUARDRAIL Part number Description Weight in kg 100006- 6 Sliding guardrail 12.00 100003- 3 Edge guardrail 10.17 100004- 1 Bottom guardrail 10.50 SLIDING GUARDRAIL SUPPORT Part number Description Weight in kg 100005- 8 Sliding guardrail support 2.70 The sliding platform with materials is installed on a structure formed from the MULTICRAB range at the desired level or, if needed, at each level of the scaffolding. The deck of the sliding platform of 2.00 m × 2.00 m, comprised of standard PANACIER decks, translates in order to open the passage of the lifting tower or to close the access and thus place the load on the latter. The opening and the closing of the sliding platform is done effortlessly by simply sliding. Once the load is placed on the deck of the sliding platform, the deck can be translated on the side, in safety, to free up the lifting tower and carry out if needed the same operation on a second level. The load is thus accessible by the employee and in complete safety and does not obstruct the passage in the scaffolding. Do not exceed the authorised load (1 Tonne distributed) and this, on 2 levels simultaneously. Ensure compliance with the bearing capacity of the uprights of the scaffolding.

RkJQdWJsaXNoZXIy OTQ2MzM=