Technical information Crab range

MULTICRAB - TECHNICAL INFORMATION - 2023 106 MOBILE SCAFFOLDING ASSEMBLY INSTRUCTIONS •Interlock the basic standards on the wheel slides. •Set up the tower by keying the ledgers onto the basic standards. •Before continuing assembly, check the condition of the wheels and the serviceability of the brakes. They must block the wheels in movement but also in rotation. When the castors are blocked, the mobile structure is completely immobilised. 1 2 3 4 •Lay 2 x 0.30 m PANACIERs in the access cell then the assembly PANACIERs. •Fit and bolt the 4 x 3.00 m uprights. •Fit the SAD guardrail in the stirrups at + 3.00 m. •Fit the ledgers in the bottom supports of the guardrails then key them in at both ends (the guardrails are now locked in place). •Fit the “no entry” sign. •Fit 1.00 m posts in the space provided in step 2. •Fit the guardrail ledgers and the gate. •Interlock the inverted 0.50 m uprights in the posts then fit the 3rd rails opposite the access. •Fit the outer diagonal braces. •Lay the PANACIERs and the PANATRAP forming the upper deck. •Safe access to the next level up. •Fit the toe boards. •Fit the 4 x 2.00 m uprights. •Repeat steps no. 3 to 5 not forgetting the 3rd guardrail rail opposite the access. 6 5 Before dismantling, make sure the wheels are braked, the stabilisers tightened and proceed in reverse order of assembly. DISMANTLING Give attention to the location of the reinforced ledgers. Be sure to leave a gap for fitting a future 1.00 m guardrail support post. Uprights MUST be double bolted.

RkJQdWJsaXNoZXIy OTQ2MzM=