54 m high access scaffolding in Toulouse

04/11/2014

toulouse_azoteThe Toulouse branch has installed this 54 m high access scaffolding for the renovation of the insulation to a nitrogen tower on the Linde Gas site, Toulouse.

24 tonnes of Multicrab have been used in this structure, which includes a lift for site staff and equipment and safety stairways
.