For blasting and repainting work on viaduct’s steel structures, the Nantes branch has designed and erected scaffolding to the bridge’s two piles (45 m and 50 m high) and three mobile scaffolds (8.00 m wide and 8.50 m high) erected on the apron. 160 tonnes of Multicrab was required for these structures.